Colocation Pricing

Updated November 2026 (originally published June 15, 2021)

When I first wrote this article back in 2021, a 10 kW cabinet was considered a pretty serious deployment. Today that’s table stakes, and AI racks are pulling 50, 80, even 100+ kW. The way data centers price colocation has changed right along with it.

So I rewrote this guide from the ground up. If you’re an IT director outgrowing the server room, a company whose new building lease has nowhere to put the servers, or a team trying to figure out where to land a GPU cluster, this is for you. I’ll cover how colocation pricing actually works, the difference between retail and wholesale, real numbers from 2026, and what to watch for in a quote.

One note before we start: the pricing here reflects the United States unless I say otherwise.

The short answer

Colocation is priced mostly by power, not space. You commit to a number of kilowatts (kW), and that number drives almost everything else. The bigger your commitment, the lower your price per kW tends to be.

Deployment Typical size How it’s usually priced Ballpark
A single cabinet (retail) 2–10 kW Cabinet + committed kW, all-in monthly Around $350/kW/month is a fair retail benchmark
A cage or suite 250–500 kW Per kW, all-in monthly $190–$235/kW/month in Northern Virginia, $200–$230 in Chicago
Wholesale 1 MW+ Base rate per kW + power passed through at cost ~$150/kW base plus power (see the 1 MW example below)
Large wholesale 10 MW+ Base rate per kW + power $160–$185/kW/month in Northern Virginia

The cage and large-wholesale ranges are CBRE’s 2026 asking rates. Your actual price depends on the market, the facility, the term, and how well you negotiate. Keep reading and I’ll show you how it all adds up.

How colocation pricing has changed

In 2000, a 2 kW cabinet was normal. By the time I wrote the original version of this article in 2021, 10 kW cabinets weren’t unusual. In 2026 the market has split into two tracks: standard enterprise colocation still runs about 3–10 kW per rack, while high-density AI colocation is built for 20–100+ kW per rack.

Chart of typical kW per colocation cabinet: about 2 kW in 2000, about 10 kW in 2021, 3–10 kW for standard enterprise and 20–100+ kW for AI in 2026
How much power a single cabinet draws, 2000 to 2026.

That jump in density changed how data centers charge. Here’s what a typical retail quote used to look like.

The legacy retail pricing model

Qty Item Monthly cost
1 Fiber cross connect $250
1 Full cabinet $500
1 20A / 120V primary power circuit $250
1 20A / 120V secondary (redundant) power circuit $0
Total $900

You paid for the cabinet, and you paid for each power circuit. The circuit size was the price.

The modern retail pricing model

You’ll still see quotes like the one above. But more and more, I see them look like this:

Qty Item Unit cost Monthly cost
1 Fiber cross connect $250 $250
1 Full cabinet $0 $0
2 Committed power, per kW $350 $700
Total $950

Notice the cabinet is free. Modern pricing doesn’t care much about circuit sizes. It cares about how much power you’re going to draw. The circuits become an installation detail, and you’re billed on the kilowatts you commit to. In this example, that’s a retail rate of $350 per kW.

The takeaway: when you compare colocation quotes, compare them on price per kW, not price per cabinet. A cheap cabinet with expensive power isn’t cheap.

What goes into a colocation quote

Every quote I’ve ever seen is built from some mix of the same pieces. In no particular order:

  • Space. A few rack units (a “U” is 1.75 inches), a full cabinet, a caged area, or a private suite. Most cabinets are 42U, though high-density designs often use taller ones.
  • Power. How many kW you commit to, how it’s delivered (the circuits), and whether it’s redundant. This is the big one.
  • Cooling. Usually baked into the power price until your density gets high.
  • Cross connects. The physical cable from your cabinet to a carrier, cloud on-ramp, or another customer in the building.
  • Bandwidth. Either the data center’s own blended internet, or bandwidth you buy directly from carriers over cross connects.
  • Remote hands. Paying the data center’s staff to do things on your behalf, like rebooting a server or swapping a drive.
  • One-time fees. Installation, circuit setup, cage build-out. These are called non-recurring charges (NRCs), and they’re often negotiable.
  • Contract terms. Length of the term, annual price increases (escalators), and whether you can ramp into your power over time.

I’ll walk through each of these, starting with the one that drives everything else.

Power: the number that drives colocation pricing

If you take one thing from this article, take this: power is the product. Space, cooling, even a lot of the staffing in a data center is sized around how much power it can deliver. So that’s how it gets priced.

How to calculate kilowatts

Take your amperage, multiply it by your voltage, and you get watts. But I only use 80% of the amperage, because you’re not supposed to load a circuit to 100%. Run it too hot and you trip a breaker.

Here’s a 30 amp, 208 volt circuit:

  • 30A × 208V = 6,240 watts. That’s the full circuit.
  • 80% of 30 amps is 24 amps. So 24A × 208V = 4,992 watts.
  • Round that to 5,000 watts, move the decimal three places to the left, and you have 5 kW.

We’d call that a 5 kW cabinet.

Formula for usable kilowatts: amps × 0.8 × volts ÷ 1,000. Example: 30A × 0.8 × 208V = 4,992 W, about 5 kW
The 80% rule: how to turn a circuit into usable kilowatts.

If your facility offers three-phase power, add one more step: multiply by 1.732 (the square root of 3). A 30A / 208V three-phase circuit works out to 30 × 0.8 × 208 × 1.732 ≈ 8.6 kW. That’s why high-density deployments almost always run three-phase.

Common circuit sizes and what they give you

Circuit Usable power at 80%
20A / 120V ~1.9 kW
30A / 120V ~2.9 kW
20A / 208V ~3.3 kW
30A / 208V ~5.0 kW
50A / 208V ~8.3 kW
60A / 208V ~10.0 kW
30A / 208V three-phase ~8.6 kW
60A / 208V three-phase ~17.3 kW
60A / 415V three-phase ~34.5 kW

Primary and redundant power (A+B)

Circuits usually come in pairs: a primary (A) feed and a redundant (B) feed, ideally on separate power paths. The B side exists for failover. It’s there so your gear stays up if the A side goes down.

That’s why you’ll often see the secondary circuit priced at $0. But there’s a catch. Your total load has to fit on one feed. If you’ve got two 30A / 208V circuits and you’re drawing 4 kW on each, you’re overloaded, because if one fails, the other has to carry 8 kW on a 5 kW circuit. Redundant circuits double the capacity on paper, but you only get to use half.

The four ways power gets billed

  1. Per circuit. The legacy model. You pay a flat monthly price for each circuit, regardless of what you draw.
  2. Per committed kW. The modern retail model. You commit to a number of kW and pay for it every month, whether you use it or not.
  3. Metered. You pay for the kilowatt-hours you actually use, sometimes on top of a base charge.
  4. Base rate plus pass-through. The wholesale model. A base rate per kW for the space and infrastructure, plus your actual power bill passed through at the utility rate, adjusted for the facility’s efficiency. More on this in the wholesale section.

Most retail colocation assumes you’ll use all of the power you’ve committed to. On a 30A circuit, that’s about 24 amps. If you’re only drawing half of that, you’re paying for headroom. I wrote more about this in You May Be Over Paying for Data Center Power.

Density, cooling, and AI racks

Cooling is usually included in the power price, as long as your density is reasonable. Most facilities can do 10 kW per cabinet at a standard price. Push that to 20, 40 or 60 kW and you’ll see higher cabinet pricing, because the facility has to remove that much more heat.

AI changed the math here. GPU racks drawing 30–100+ kW need liquid cooling (rear-door heat exchangers or direct-to-chip), heavier power distribution, and sometimes reinforced floors. Expect fewer facilities that can support it, longer lead times, cooling surcharges, and a premium per kW. If you want a feel for how much compute actually fits in one rack, I broke it down in How Much Cloud Can You Get Out of a Single Rack?

Retail vs. wholesale colocation pricing

This is where a lot of the confusion comes from. “Colocation” covers everything from a few servers in a shared cabinet to a 20 MW build-to-suit for a hyperscaler. Those are priced very differently.

Retail colocation

Retail is what most people picture: a single cabinet up to a few cages, roughly anything under 250 kW. You get an all-in monthly charge for space plus your committed power. Cross connects, bandwidth and remote hands are add-ons.

Retail is flexible. You can start small, the terms are shorter, and the data center handles the build-out. You pay for that flexibility in a higher price per kW.

The middle ground: 250 kW to 1 MW

This is the deal size CBRE tracks in its market reports, so it’s the best public benchmark we have. In Q1 2026, CBRE put asking rates for a 250–500 kW requirement at $200–$230 per kW per month in Chicago and $190–$235 in Northern Virginia. At this size you’re usually still on an all-in rate, but you have real negotiating leverage.

Wholesale colocation

Once you get to a megawatt or more, you’re in wholesale territory. Here the main metric is the energy you need. You order 1 MW of capacity, and the facility designs the circuits, cabinets, cooling and space around that power draw.

Wholesale is commonly priced in two parts:

  1. A base charge per kW. This covers the space, the power and cooling infrastructure, and the facility’s margin.
  2. Power passed through at cost. You pay for the electricity you actually use, at the local utility rate, multiplied by the facility’s PUE (power usage effectiveness, a measure of how much extra power goes to cooling and overhead). A PUE of 1.4–1.5 is typical.
Wholesale colocation pricing formula for 1 MW: $150,000 base charge plus $151,200 power pass-through equals about $301,200 per month
The wholesale formula, using the 1 MW example.

I walked through the full math in What Does 1 Megawatt of Data Center Space Cost?. At a $150/kW base rate and a $0.14/kWh utility rate, 1 MW comes to about $301,200 a month, and roughly half of that is the power bill.

One thing to keep in mind: in power-tight markets, big-block pricing has kept climbing. In H1 2026, CBRE reported asking rates of $160–$185 per kW for 10+ MW requirements in Northern Virginia, with only 10.8 MW of supply available.

Retail vs. wholesale at a glance

Retail Wholesale
Typical buyer Enterprises, MSPs, SaaS companies Hyperscalers, large SaaS, AI and cloud providers
Deployment size 1 cabinet to ~250 kW 1 MW and up
Pricing unit Cabinet + committed kW, or all-in per kW Base rate per kW + power at cost
How power is billed Committed kW, used or not Metered and passed through × PUE
Contract term Often 1–3 years Often 5–10+ years
Who builds it out The data center Often built to your spec
Price per kW Higher Lower
Flexibility High Low

If you’re right on the edge, say 500 kW to 1 MW and growing, it’s worth asking providers for both a retail-style and a wholesale-style quote. It’s also worth asking whether building your own makes more sense. Our build vs. lease tool can help you think that through.

Real-world colocation pricing examples

Numbers in the abstract only go so far, so here are four deployments from small to large. These are illustrations built from the benchmarks in this article, not quotes. Your market and your provider will move them around.

Example 1: one cabinet, 5 kW, retail

A single cabinet with a pair of 30A / 208V circuits (A+B), one cross connect, and the data center’s blended bandwidth.

Item Monthly cost
Full cabinet $0 (included)
5 kW committed power at $350/kW $1,750
1 fiber cross connect $250
1 Gbps blended bandwidth $500–$1,000
Total ~$2,500–$3,000/month

Plus one-time installation fees, which vary by provider and are worth negotiating.

Example 2: a small cage, 10 cabinets at 5 kW (50 kW)

At 50 kW you’re still retail, but you’re a meaningful customer. I’d expect the per-kW rate to land somewhere between the single-cabinet rate and CBRE’s 250–500 kW benchmark. At $250–$300 per kW, that’s $12,500–$15,000 a month for power and space, before cross connects and bandwidth. A redundant pair of cross connects to two different carriers adds another $500 or so at $250 each.

Example 3: 1 MW, wholesale

From our 1 MW pricing breakdown:

Component Math Monthly cost
Base charge 1,000 kW × $150/kW $150,000
Power pass-through 720,000 kWh × $0.14/kWh × 1.5 PUE $151,200
Total ~$301,200/month

The 720,000 kWh assumes a fully loaded 1 MW running 24 hours a day for 30 days. In a cheaper power market at $0.05/kWh, the power line drops to $54,000 and the total to about $204,000. That’s why wholesale buyers care so much about where the data center is.

Example 4: a high-density AI rack

Take a single GPU rack drawing 40–80 kW. Even at a standard per-kW rate, the power alone is several times what a normal cabinet costs. On top of that, expect a premium for liquid cooling and fewer sites that can host it. Get quotes early, because high-density capacity in the major markets is often spoken for before it’s built.

Line-item colocation price ranges

Here’s what I typically see for each piece of a retail quote.

Item Typical range How it’s billed
Cabinet / rack $0 (bundled) to $300–$2,000/month Monthly, depending on region and cooling
Committed power (retail) ~$350/kW/month for a single cabinet, less at scale Monthly, per kW committed
Cross connect $50 one-time up to $350/month One-time or monthly, per connection
Blended bandwidth $500–$1,000 per Gbps/month Monthly, depending on the carrier mix
Remote hands $100–$200/hour Billed in 15- or 30-minute increments
Installation and setup Varies widely One-time (NRC)

Cross connects

Cross connect pricing is all over the map, and it’s a common source of pain. Why are you charging me so much for a piece of fiber that runs 50 feet? Fair question.

Data centers justify it this way: the cross connect is treated as a mission-critical circuit. It’s covered by the SLA, it’s monitored, and the data center is on the hook for keeping it connected and secure. For some data centers, it’s also a major revenue stream, and they’d argue it’s justified by the network access you get in that building. If nearly every carrier and cloud provider you need is in the facility, all your important partners are just a cross connect away. That’s worth something.

Bandwidth

You’ve got two ways to get internet into your cabinet. The first: buy one or two cross connects from the data center, then buy bandwidth from one or two carriers for failover. The second: buy the data center’s own blended bandwidth, which is built from two or more internet providers.

What I call “in-house blended bandwidth” varies a lot from one data center to the next. Generally, a Gbps will run between $500 and $1,000 per month. The advantage is speed and simplicity. You don’t have to set up failover with BGP yourself, and you sign one contract instead of two.

Remote hands

I’ve seen remote hands fall between $100 and $200 an hour. Data centers like to bill in 15- or 30-minute increments, so if you ask them to reboot a server and it takes five minutes, you’re paying for 15 or 30. Some data centers will give you a better rate if you commit to a monthly block of remote hands. That helps them plan their staffing, and it helps you get faster support.

Why colocation prices vary so much

Two data centers ten miles apart can quote you very different numbers. A few reasons why.

The market and the power grid

The biggest factor in 2026 is power availability. In markets where the utility can’t deliver new capacity fast enough, there’s very little space left and prices rise. CBRE reported Northern Virginia vacancy at just 0.3% in Q1 2026, and Atlanta at 1%. Markets further from the big cloud regions are usually cheaper, though CBRE notes that gap is narrowing.

How the data center was built

Data center space is costed like any other product: overhead plus margin. But the starting investment varies more than most businesses. A provider might have bought a financially distressed or foreclosed data center, poured concrete and built from scratch, or bought an existing building and retrofitted it. Each path has a very different cost basis, and that shows up in what they charge you.

The power vs. space dilemma

There’s also a balancing act that every data center’s product team has to get right. They’re trying to avoid three outcomes:

  • Selling all the space with power left over. That means they sold too much low-density space.
  • Selling all the power with space left over. That means they sold too much high-density space, and the empty floor can’t be sold.
  • Filling the building with slim profits. That means space was sold too cheap.

I’ve seen this go wrong first-hand, and it always seems to go down the same way. A major online company needed a lot of space and didn’t want to build its own data center. The data center couldn’t resist the massive influx of revenue, so it sold a deal that was high in power, low in space, and thin on margin. Once that deal closed, the rest of the building had plenty of square footage but almost no power left to sell in it. From then on, every new customer’s power had to be closely calculated, and every additional circuit could only be sold after an audit of the remaining power and cooling.

Some data centers can add power and cooling capacity. In many cases, though, the local utility is the limit unless major capital gets thrown at the problem. In the AI era, this dilemma is the whole game.

Redundancy and certifications

A facility with fully redundant power and cooling paths, and the certifications regulated industries need, costs more to build and run. Expect to pay more for it.

Your commitment

The more kW you commit to and the longer your term, the better your rate. A ramp schedule, where you commit to a total and grow into it over time, can get you a lower rate without paying for power you’re not using yet.

2026 colocation pricing by market

Here’s where asking rates stand in the markets CBRE reported on in 2026. These are what providers are asking, before negotiation. Single-cabinet retail usually runs higher per kW than these.

2026 colocation asking rates by market in $ per kW per month, from CBRE: Singapore, Silicon Valley, Frankfurt, Northern Virginia, Chicago, and São Paulo
2026 asking rates by market, in $ per kW per month. Ranges from CBRE.

A few things stand out:

  • Silicon Valley is among the priciest markets in North America at $200–$275 per kW, because powered land there is so scarce. If that’s your market, see our Silicon Valley colocation page.
  • Chicago posted the biggest increase of the top four US markets, up 14.7% year over year to $200–$230.
  • Northern Virginia, the largest data center market in the world, runs $190–$235 for 250–500 kW, and $160–$185 for 10+ MW. Most of that capacity is around Ashburn.
  • Atlanta rates rose about 2%, and Dallas-Fort Worth held flat. Both are worth a look if you have flexibility on location.
  • Outside the US, Singapore is among the most expensive markets in the world at $330–$475, Frankfurt leads Europe at $235–$265, and São Paulo is one of the most affordable major markets at $130–$190.

Looking for a specific city? Browse our US data center markets or find a data center near you.

How to read (and negotiate) a colocation quote

When a quote lands in your inbox, here’s what I’d check before signing anything:

  • Committed vs. actual power. Are you committing to more kW than you’ll really draw? Measure first if you can.
  • The real price per kW. Add up space, power and any bundled items, then divide by kW. That’s the number to compare across providers.
  • Escalators. How much does the price go up each year, and is it capped?
  • Term and renewal. What happens at the end of the term? Is there a renewal cap?
  • Ramp schedule. If you’re growing, can you commit to a total and ramp into it?
  • Cross connects. Can any be waived or bundled, especially the first few?
  • Remote hands. Is a monthly block cheaper than paying hourly?
  • Power pass-through. On larger deals, what PUE and utility rate are they assuming?
  • One-time fees. Can installation and setup be waived for a longer term?
  • Density headroom. Can the facility support the density you’ll need in three years, not just today?

The single best piece of leverage you have is competition. Get quotes from more than one provider, in more than one market if you can. That’s exactly what we do at 515 Engine. Our colocation sourcing service reaches out to multiple providers in a single shot, pulls back pricing, and lays it out so you can compare apples to apples. For larger deals, our RFx team can run a formal RFP for you.

Colocation pricing FAQ

How much does a full rack of colocation cost per month?

For a single cabinet at around 5 kW, figure roughly $2,500–$3,000 a month all-in, with power, a cross connect, and bandwidth included. The power commitment is the biggest piece. A higher-density rack costs more.

Is colocation priced per rack or per kW?

Increasingly per kW. Some providers still price the cabinet and each circuit separately, but the modern model bills you on committed power, and the cabinet is often included.

What’s the difference between retail and wholesale colocation pricing?

Retail (under about 250 kW) is an all-in monthly rate for space and committed power. Wholesale (1 MW+) is usually a base rate per kW plus your actual power usage passed through at cost. Wholesale is cheaper per kW but comes with longer terms and less flexibility.

How much does 1 MW of colocation cost?

Using a $150/kW base rate and $0.14/kWh power, about $301,200 a month. Here’s the full 1 MW cost breakdown.

How do I calculate kW for a colocation rack?

Multiply amps × 0.8 × volts, then divide by 1,000. A 30A / 208V circuit gives you about 5 kW.

Why are cross connects so expensive?

Data centers treat them as mission-critical circuits covered by their SLA and monitoring. And the access to carriers and clouds in the building is part of what you’re paying for.

Is colocation cheaper than the cloud?

For steady, predictable workloads, it often is, sometimes by a lot. I ran the numbers for a single 10 kW rack in How Much Cloud Can You Get Out of a Single Rack?, and if your cloud bill keeps climbing, Why Is Cloud So Expensive? is worth a read.

Get colocation pricing for your requirements

My goal here was to lay out how colocation pricing really works. Some facilities offer the basics: space, power, cross connects, remote hands, and nothing else. Others layer on so many services that it starts to look like a managed cloud. Either way, the price you get depends on your power, your market, and how many providers are competing for your business.

If you’re putting together a data center strategy, let’s talk. We’ll reach out to multiple colocation providers, pull back pricing, and present it to you in a way that’s easy to read. And if you’re planning a move, our data center migration project plan is a good place to start.